Archive
(173 Total Articles)Page 1 of 5.
St. Joseph commissioners moved a wastewater lift station project forward. For other systems, this is the kind of local capital decision that can affect collection reliability, replacement timing, and the financing or permitting path for a single facility.
A joint venture won a contract to build work at San Francisco’s wastewater plant. The piece matters for the city system because it points to a major capital project, but the excerpt does not say what treatment units will be built or upgraded, how the work will be financed, or any schedule details.
Maryville is raising water rates over the next two fiscal years, which is a local drinking-water affordability and revenue story. The excerpt does not say what capital work, debt, or utility costs are driving the increase.
The story says Camden County Water District received funding for drinking water upgrades. For systems facing the same kind of award, the practical effect is added money for capital work that can move planned treatment or distribution improvements forward; the excerpt does not say which facilities, pipes, or compliance issues the district will address.
The story is about a Minnesota drinking-water system facing higher PFAS treatment costs and residents pushing back on what that means for their bills. It affects systems dealing with PFAS compliance because it points to the cost side of treatment, financing, and rate pressure, but the excerpt does not say what treatment technology is being used or whether the utility has made a final spending decision.
EPA funding supports wastewater conveyance upgrades in Fort Pierce. The piece matters to other systems because it shows how federal grant money can be used for collection and transport infrastructure, but the excerpt does not say what specific work will be done or how much capacity or compliance risk it addresses.
The story concerns a Texas desalination effort tied to a foreign supplier and the cost of water Texas could owe if the project goes forward. For systems facing the same kind of project, the issue is how much a desalination contract can affect long-term water supply costs and financing; the excerpt does not say whether any utility has signed a final deal or what project terms would apply.
The piece appears to be about a drinking-water or wastewater capital improvement funded through revolving funds, but the excerpt does not say which utility system is involved or what the upgrade changes. For systems facing similar funding, it signals a local capital project that will affect construction and financing decisions, but the source does not specify the plant, network segment, or compliance driver.
County commissioners were briefed on a proposed rate increase for Union Williams PSD, so the story is about utility pricing and affordability decisions for a local drinking-water system. The excerpt does not say why the increase is being sought, what the new rates would be, or whether commissioners approved anything.
The bill would create federal funding for utilities that need to remove PFAS from drinking water. For systems facing the same contamination rule or cleanup deadline, the story matters because it points to a possible source of capital for treatment work and compliance spending; it does not say which utilities would qualify or how the money would be distributed.
The story says the Kalaeloa desalination plant has won three approvals, but the start of construction has slipped to 2027. For other drinking-water systems, it shows how permitting and project review can delay a major source-water project even after key approvals are in hand.
The story is about a city moving wastewater treatment projects forward, so it affects what Apopka will build and likely finance. The excerpt does not say which specific project, cost, schedule, or regulatory driver is behind the commission action.
Bar Nunn is seeking state revolving fund financing for a water meter replacement project. The story matters for a drinking water system because it would affect billing accuracy, metering work, and how the project gets paid for if the loan is approved.
Suffolk Water Authority received funding to address PFAS treatment at its drinking water system. The story matters for a utility facing contaminant compliance work and the capital costs tied to it.
Plattsmouth secured financing for water infrastructure work tied to flooding impacts. The piece concerns a local utility system’s capital funding, but the excerpt does not say which facilities or projects the money will cover.
Missouri’s Metropolitan St. Louis Sewer District received state assistance for utility work. The piece matters for systems watching how revolving-fund support helps finance wastewater projects and related compliance obligations.
The piece is about street and drainage work that officials are holding up as the kind of local infrastructure project a ballot measure would finance. For other stormwater systems, it signals how funding decisions can be tied to visible neighborhood projects rather than plant-level compliance work.
Cardington officials are working with Del-Co to finish a deal tied to funding or a revolving fund arrangement. The excerpt does not say what system work, financing terms, or compliance issue the deal would affect.
Encampment is seeking a low-interest loan to pay for sewer repairs. The story affects a wastewater system's financing and project planning, but the excerpt does not say what repairs are needed or whether the loan has been approved.
The story says the state environmental agency approved funding for water infrastructure work in four Louisiana towns. It matters to those systems because it points to capital projects that will affect what they can build or upgrade, but the excerpt does not say which facilities or improvements are covered.
Perrysburg is tying its drainage history to a new stormwater fee, so the piece is about how the town will fund and manage stormwater work. It affects systems facing local stormwater billing decisions, but the excerpt does not say what projects will be built or how the fee is set.
Moses Lake is getting more money to deal with a contaminated well, which points to another round of drinking-water remediation work for the system. The excerpt does not say what contaminant is involved, what the funding will pay for specifically, or whether this is tied to a larger treatment or replacement project.
The item says the city council will review a large water funding package, so it affects drinking-water financing and likely how the utility will move projects forward. The excerpt does not say which projects are included, whether the money is for drinking water or wastewater, or whether any decision was made.
AMWA and NACWA are urging Congress to approve a water infrastructure package, so the story is about federal funding for utility systems rather than a project already underway. It affects drinking-water and wastewater utilities that rely on federal aid for capital work and financing, but the excerpt does not say what is included in the package or whether any money is guaranteed.
The town is adjusting its budget because sewer rates are rising more than expected. That affects the wastewater system's operating costs and what local customers will pay.


