Archive
(173 Total Articles)Page 1 of 1.
Paterson is using green infrastructure to address chronic flooding, which puts the story in the stormwater system and the projects lane. It affects how the city manages runoff and reduces pressure on its drainage and combined sewer infrastructure, but the excerpt does not say what specific measures are being built or how they are financed.
Lowell is expanding work tied to combined sewer overflows, which puts the story in wastewater and stormwater infrastructure. For other systems facing the same CSO rule or deadline, the relevant change is that a local utility is adding more project work to address overflow control; the excerpt does not say what specific construction, permits, costs, or schedule changes are involved.
The piece is about street and drainage work that officials are holding up as the kind of local infrastructure project a ballot measure would finance. For other stormwater systems, it signals how funding decisions can be tied to visible neighborhood projects rather than plant-level compliance work.
Perrysburg is tying its drainage history to a new stormwater fee, so the piece is about how the town will fund and manage stormwater work. It affects systems facing local stormwater billing decisions, but the excerpt does not say what projects will be built or how the fee is set.
Gulfport is looking at how to pay for a large stormwater project, with grants and loans among the options. The story matters for other cities weighing financing for drainage work because it points to the funding side of a local stormwater need, not a finished project or a regulatory action.
Garfield Heights is moving ahead with a sewer project aimed at reducing flooding. The piece matters for local wastewater and stormwater systems because it signals a capital project that will change how the city manages wet-weather flows.
Des Moines says a newly constructed wetland has been added to a flood management basin to improve water quality. The piece is about a stormwater project that changes how the site manages runoff and treatment, not a utility rate, permit, or enforcement action.
The story is about a state-funded stormwater project in South Lake Tahoe that is meant to keep pollutants out of Lake Tahoe. For utilities facing the same funding stream or stormwater deadline, it signals that project money is going to source-control work rather than treatment plant changes; the excerpt does not say which agency will operate the project or what specific facilities will be built.
The city council ended a dedicated stormwater drainage fund. That changes how the system is financed and may affect how Laramie pays for stormwater work going forward.
New York is distributing water grants and starting a new round of flood-related funding. For systems that want state money, the story signals another financing window, but the excerpt does not say which utilities, projects, or eligibility rules are involved.
St. Augustine is moving ahead with a flood mitigation project that uses green infrastructure in the Court Theophelia area. For systems with similar stormwater obligations, the story points to local capital work aimed at reducing flood impacts rather than a compliance action or utility operations change.
New York City is converting concrete medians into green infrastructure to hold and slow stormwater. The story is about a stormwater project that changes how the city manages runoff and flooding on built streets.
Fort Madison is starting a sewer separation project, which means the city is changing a combined system so stormwater and wastewater run separately. For systems facing the same overflow or CSO issue, the story signals construction work tied to collection-system capacity and compliance, but the excerpt does not say the project scope, schedule, funding source, or any regulatory driver.
EPA has issued a draft administrative order tied to Bristol’s storm drains, which makes this an enforcement and compliance story for the city’s stormwater system. The excerpt does not explain the alleged violation, the deadline for a response, or whether any utility construction or rate effect follows.
The story is about funding for a green infrastructure project along Chollas Creek in San Diego. For systems facing similar stormwater rules or retrofit deadlines, it points to outside money being used for local stormwater control work rather than to a utilitywide compliance action.

